Table of Contents
How do you calculate fabric consumption per garment?
So fabric consumption must be calculated accurately….Basic formula:
Measurements without allowances | Measurement with allowances |
---|---|
Chest (C) = 23.25” Body Length (L) = 30.5” Sleeve Length (SL) = 26” Bicep (B) = 9.2” Fabric GSM =200 | +1.75” = 25” +2.50” = 33” +1.50” = 27.5” +0.80” = 10” |
How do you calculate fabric consumption for pants?
Trouser consumption calculation is widely used in the garment industry and especially in apparel merchandising. It is an important task for merchandisers….The basic formula of fabric consumption:
- Outseam = 42 inch.
- Inseam = 32”
- Waist = 36”
- Hip = 40”
- Bottom = 20 “
- Fabric width =58”
How do you calculate fabric consumption for woven garments?
Shortcut Method of Fabric Consumption Formula for Woven Shirt
- Body length = Body length + Seam allowance. (In case of wash garments, washing allowance to be added).
- Body width = Chest width + Seam allowance. (In case of wash garments, washing allowance to be added).
- Sleeve length = Sleeve length + Seam allowance.
How do you calculate fabric consumption?
- Fabric Consumption by Single Formula Method: (Body length + Sleeve L. + Allowance) × (Half Chest + Allowance) × 2 × 12 × 160.
- Fabric Consumption by Individual formula Method: Body part consumption; (Body length + Allowance) × (Half Chest + Allowance) × 2 × 12 × 160 × 1.10.
- Fabric Consumption by marker planning formula:
How do you calculate consumption?
The consumption function is calculated by first multiplying the marginal propensity to consume by disposable income. The resulting product is then added to autonomous consumption to get total spending.
How do you calculate cost of garments?
Example of garment costing:
- CMT charges are calculated as: Total available capacity per month (in minute) = 26 working days*8 hours/day*60=12,480 minutes.
- Labour cost per minute = (Monthly salary of an operators/Total minutes available in the month) at 100% efficiency.
- = 6000/12480.
How is SMV calculated?
Calculate Standard minute Standard Minute Value = (Basic minute + Bundle allowances + machine allowance + personal fatigue allowances). Normally, when SMV is measured through time study method, the operation cycle is broken down into operation elements and observed time is captured element-wise.
https://www.youtube.com/watch?v=lM6BspXCNOg