It helps the users to visualize data thoroughly and in a detailed fashion. For any level of data, drill-down is a feature used to get a more granular overview of the data rather than a general view. You can select a country, and “drill down” to more definitive semantics like state, city, town, and zip code.

What is a drill down chart?

Drill down charts are used to give another level of detailed reporting to charts. Users click a specific bar or segment of a chart to drill-down to a more detailed report. To create a drill-down chart report, create the drill-down report and then create the master chart definition.

How do you drill down?

Add drill up/drill down using an existing hierarchy

  1. Create a visualization using an existing hierarchy.
  2. Convert the table to a matrix or chart.
  3. To enable drill-down, collapse the matrix.
  4. Double click a top-level hierarchy field.
  5. Drill down further by clicking one of the fields.
  6. Drill up by clicking the up arrow.

What is a drill down dimension?

The drill-down dimension is a handy feature of Qlik Sense. It allows you to add grouped dimensions into visualizations, which are then automatically drilled-through, based on filter selections in the data model.

What is difference between drill through and drill down?

Further levels of drill down can be set up within the report–practically as many as supported by the data. Instead of taking the user to a more granular level of the data, drill through takes him to a report that is relevant to the data being analyzed, also at the click of a mouse.

What is difference between drill down and drill through report?

Drill Down is the way to have summary values view and if we would like to see the detail , we can expand that part to see the details. You can use + and – signs to change to summarize view or detail view of a report. Drill through Report: Let’s think about a real time scenario, Where we have Region Sale Summary report.

What is drill down in Datastudio?

Drilling down gives viewers a way to reveal additional levels of detail within a chart. For example, suppose you want to report on sessions by country, and sessions by city. Rather than include two charts in your report, you can include a single chart with drill-down enabled.

What is drill down in Highcharts?

8, Highcharts has built-in support for drilldown. By giving a point configuration a drilldown option that corresponds to a series configuration in the drilldown. series array, the point is linked to a hidden series. When the point is clicked, this series is loaded in the chart and replaces the existing series.

What is a drill down question?

Drill Down questions allow users to select an answer by narrowing down their choice from a general category to a specific category. For example, you could first have users select which state they live in, and then select a city within that state.

What do you mean by drill down and drill up?

Drilling up. Drilling up means to replace the data you are drilling up on with the data for the parent element of that data. Drilling down means to replace the data you are drilling down on with the data for the child element of that data. You drill down to see more detail about data.

What is the way to create a drill down in Qliksense?

Creating a drill-down dimension

  1. Select Drill-down as dimension type.
  2. Click at least two fields from the fields list on the left-hand side to insert them as the referenced fields.
  3. Type a name for the dimension.
  4. Type a description for the dimension (optional).

Can you drill down in data studio?

In the data panel of your chart, you will see a drill-down toggle button in the dimension section. Click on the toggle button to enable Drill down. Once enabled, drill down allows you to add more dimensions to your chart. List the dimensions in order from most broad to most specific.

How to create a drill down from a diagram?

Today, you will create a drill-down from an existing diagram. [Right-Click] on the ‘IVR’ application and select Create Drill-down diagram Notice that a diagram has appeared containing the ‘IVR’ component and everything that is directly attached to it.

How is the drill down technique used in math?

The drill down technique looks to break the key problem down into its elements and hence find a solution to these factors, with the overall aim of solving the key problem. The technique starts with a table with the key problem outlined in the first column, as shown below.

Can a drill down be added to a bar chart?

Drill up/drill down can also be added to bar, column, and pie charts. The nice thing about having a hierarchy that already exists in the data model is that you can use it over and over in lots of Power View sheets and reports. Create a visualization using an existing hierarchy.

Can you drill down in a power view?

Drill up/drill down can also be added to matrices, column charts, and pie charts. In order to drill down/drill up you need a hierarchy. In the previous example you used an existing hierarchy. In this example, you’ll create an ad-hoc hierarchy in Power View. The hierarchy need not be “logical”; it can be any fields that you want to drill